Open Access Open Access  Restricted Access Subscription Access
Open Access Open Access Open Access  Restricted Access Restricted Access Subscription Access

Errors of Projection in Input-Output Model and its Correction: An Experiment with Indian Data


Affiliations
1 Department of Economics, Jadavpur University, Calcutta, India
     

   Subscribe/Renew Journal


The projeclion of sectoral outputs of an economy is carried on the basis of the Input-Output coefficient matrix of the base period From the different empirical tests made it appears that errors are likely to urise in the projection of economic variables through Input-Output Model. This is so more in developing countries like India because of the rapid economic change taking place in these countries. It is, therefore, necessary to correct the projected values to arrive at more reliable estimate. Various altempts have been made to find out methods for estimation of the size of the error in Input-Output model. Of these attempts, Theil's contribution is worth mentioning. The present paper will present certain modification of Theil's model and experiment with this modified model is done with Indian data.
Subscription Login to verify subscription
User
Notifications
Font Size

Abstract Views: 504

PDF Views: 1




  • Errors of Projection in Input-Output Model and its Correction: An Experiment with Indian Data

Abstract Views: 504  |  PDF Views: 1

Authors

Shibani Maiti
Department of Economics, Jadavpur University, Calcutta, India
Debesh Chakraborty
Department of Economics, Jadavpur University, Calcutta, India

Abstract


The projeclion of sectoral outputs of an economy is carried on the basis of the Input-Output coefficient matrix of the base period From the different empirical tests made it appears that errors are likely to urise in the projection of economic variables through Input-Output Model. This is so more in developing countries like India because of the rapid economic change taking place in these countries. It is, therefore, necessary to correct the projected values to arrive at more reliable estimate. Various altempts have been made to find out methods for estimation of the size of the error in Input-Output model. Of these attempts, Theil's contribution is worth mentioning. The present paper will present certain modification of Theil's model and experiment with this modified model is done with Indian data.


DOI: https://doi.org/10.21648/arthavij%2F1998%2Fv40%2Fi3%2F115914