The project involves detailed cost estimation and duration analysis of a building constructed by MIVAN formwork and Conventional formwork. The buildings are of G+21 floors where the saleable area of building with Mivan formwork is 8747.28 S.ft and that with Conventional Method is 9786.67 Sft on each floor with 3.0 m as the height of each floor. Later comparative analysis is done on cost and duration of both the buildings.

Keywords

MIVAN Formwork, Conventional Formwork, Detailed Estimation, Duration, Comparison.
User
Notifications
Font Size

Abstract Views: 202

PDF Views: 0




  • Comparative Analysis of MIVAN Formwork Building and Conventional Formwork Building Based on Cost and Duration

Abstract Views: 202  |  PDF Views: 0

Authors

Danish Sadruddin Ansari
Department of Civil Engineering, Pad. Dr D.Y Patil Institute of Engineering, Management and Research, University of Pune, Akurdi, India
Pratik Sudhakar Kudale
Department of Civil Engineering, Pad. Dr D.Y Patil Institute of Engineering, Management and Research, University of Pune, Akurdi, India

Abstract


The project involves detailed cost estimation and duration analysis of a building constructed by MIVAN formwork and Conventional formwork. The buildings are of G+21 floors where the saleable area of building with Mivan formwork is 8747.28 S.ft and that with Conventional Method is 9786.67 Sft on each floor with 3.0 m as the height of each floor. Later comparative analysis is done on cost and duration of both the buildings.

Keywords


MIVAN Formwork, Conventional Formwork, Detailed Estimation, Duration, Comparison.