Open Access Open Access  Restricted Access Subscription Access

Re-Circulated Lake Water:An Optimal Solution for Power, Revitalization and Inundation - An Overview


Affiliations
1 TATA Consulting Engineers Ltd., Bengaluru, India
2 BR Architects & Engineers Pvt. Ltd., Bengaluru, India
 

This study note is a guideline to set-up a model mini hydro power station (2x500) KW capacity, using re-circulated water from a city lake. In terms of location, terrain, water availability and ease of interconnectivity Kaikondahalli & Agara Lakes in Bengaluru were found to be suitable for this Pilot Study.

Keywords

Channels, Fore Bay, Penstocks and Power Block.
User
Notifications
Font Size

Abstract Views: 173

PDF Views: 0




  • Re-Circulated Lake Water:An Optimal Solution for Power, Revitalization and Inundation - An Overview

Abstract Views: 173  |  PDF Views: 0

Authors

Swapan Ray Chaudhury
TATA Consulting Engineers Ltd., Bengaluru, India
Indranil Bhattacharya
BR Architects & Engineers Pvt. Ltd., Bengaluru, India

Abstract


This study note is a guideline to set-up a model mini hydro power station (2x500) KW capacity, using re-circulated water from a city lake. In terms of location, terrain, water availability and ease of interconnectivity Kaikondahalli & Agara Lakes in Bengaluru were found to be suitable for this Pilot Study.

Keywords


Channels, Fore Bay, Penstocks and Power Block.