![Open Access](https://i-scholar.in/lib/pkp/templates/images/icons/fulltextgreen.png)
![Restricted Access](https://i-scholar.in/lib/pkp/templates/images/icons/fulltextred.png)
Re-Circulated Lake Water:An Optimal Solution for Power, Revitalization and Inundation - An Overview
This study note is a guideline to set-up a model mini hydro power station (2x500) KW capacity, using re-circulated water from a city lake. In terms of location, terrain, water availability and ease of interconnectivity Kaikondahalli & Agara Lakes in Bengaluru were found to be suitable for this Pilot Study.
Keywords
Channels, Fore Bay, Penstocks and Power Block.
User
Font Size
Information
![](https://i-scholar.in/public/site/images/abstractview.png)
Abstract Views: 173
![](https://i-scholar.in/public/site/images/pdfview.png)
PDF Views: 0