Abstract Views :103 |
PDF Views:0
Authors
Affiliations
1 Dept. of Mechanical Engg., Vishwakarma Institute of Information Technology, Pune, Maharashtra, IN
Source
International Journal of Engineering Research, Vol 3, No 5 (2014), Pagination: 321-323
Abstract
Single minute exchange of dies along with ECRS can be used efficiently to reduce setup time. The present paper provides an analysis of current changeover methods of bearing ring grinding machine in a manufacturing plant having line layout. The study gives methods for reducing setup time using above mentioned tools.
Keywords
SMED, ECRS, Setup Time, Line Layout.
Full Text