Abstract Views :159 |
PDF Views:0
Authors
Affiliations
1 TATA Consulting Engineers Ltd., Bengaluru, IN
2 BR Architects & Engineers Pvt. Ltd., Bengaluru, IN
Source
International Journal of Engineering Research, Vol 3, No 11 (2014), Pagination: 628-631
Abstract
This study note is a guideline to set-up a model mini hydro power station (2x500) KW capacity, using re-circulated water from a city lake. In terms of location, terrain, water availability and ease of interconnectivity Kaikondahalli & Agara Lakes in Bengaluru were found to be suitable for this Pilot Study.
Keywords
Channels, Fore Bay, Penstocks and Power Block.
Full Text