Open Access Open Access  Restricted Access Subscription Access
Open Access Open Access Open Access  Restricted Access Restricted Access Subscription Access

Operational Optimization of Turbo Generator Units and Auxiliaries in Large Run - off the River Hydro Power Plants


Affiliations
1 Energy Efficiency and Renewable Energy Division at CPRI Bangalore, India
     

   Subscribe/Renew Journal


This paper presents the operational optimization to be implemented, based on the energy performance evaluation study carried out in a few large run off the river hydro power plants. The design parameters are compared with operating parameters and the deviations are analyzed. The various operational optimization opportunities available are described in this paper

Keywords

Hydro Power Plant, Operational Optimization.
User
Subscription Login to verify subscription
Notifications
Font Size

Abstract Views: 243

PDF Views: 0




  • Operational Optimization of Turbo Generator Units and Auxiliaries in Large Run - off the River Hydro Power Plants

Abstract Views: 243  |  PDF Views: 0

Authors

S. Jothibasu
Energy Efficiency and Renewable Energy Division at CPRI Bangalore, India

Abstract


This paper presents the operational optimization to be implemented, based on the energy performance evaluation study carried out in a few large run off the river hydro power plants. The design parameters are compared with operating parameters and the deviations are analyzed. The various operational optimization opportunities available are described in this paper

Keywords


Hydro Power Plant, Operational Optimization.



DOI: https://doi.org/10.33686/prj.v7i2.189817