Open Access
Subscription Access
Open Access
Subscription Access
An Evaluation of Constraints and Expectations of Irrigation Information in Command Areas of Tungabhadra and Upper Krishna Projects
Subscribe/Renew Journal
An evaluation of constraints and expectations of irrigation information in command areas was studied in both Tungabhadra (TBP) and Upper Krishna (UKP) Projects during the year 2008-09. The lack of data base software (100%) and proper communication channel (100%) were the major constraints as opined by the irrigation engineers, whereas lack of cooperation from irrigation department (81-97%) followed by lack of education (73-75%) were major constraints as opined by farmers. Information on water losses in canals (80-90%) was the major expectation of engineers, whereas alternative cropping pattern (84-89%), dissemination of irrigation information through mass media (80-82%) and through WUCSs (75-77%) formed the major expectations of farmers in all regions of both the command areas.
Keywords
Constraints, Expectations, Irrigation, Information, Evaluation.
Subscription
Login to verify subscription
User
Font Size
Information
Abstract Views: 294
PDF Views: 0