The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader. To download the PDF, click the Download link above.

Fullscreen Fullscreen Off


The shield construction is used from Xitieying staiton to You'anmen outside station in a Beijing subway project. When the tube sheets break away from the the shield tail, an annular gap will be formed between the soil and the tube sheets. The paste can reduce the ground subsidence and even collapse when it is synchronously grouted to the annular gap. After filling, the soil pressure on the tube sheet can improve the early stability and the sealing property of the tube sheet lining. The hardening filling layer can also serve as waterproof; it has waterproof effect, but also can improve the strength and durability of the tunnel lining structure. Due to the flexible construction method, short construction period, low cost and so on, the synchronous grouting method has become a common method in shield construction.

Keywords

Subway, Shield Tunnel, Synchronous Grouting.
User
Notifications
Font Size