The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader. To download the PDF, click the Download link above.

Fullscreen Fullscreen Off

   Subscribe/Renew Journal


This paper is aimed at reducing the costs, maintaining the quality and designing the plant layout that is flexible to meet the customer demand. A number of stations in the after test assembly and after paint assembly are selected for capturing the production process requirements. Then, failure mode and effects analysis of after test assembly is carried out. Layout designs for the after test assembly and after paint assembly are developed using systematic layout planning and are validated using Spaghetti diagrams. With the improved layout, considerable reduction in the distance moved by the operator has resulted in 20% cost saving at 80% Takt time.

Keywords

Systematic Layout Planning, Assembly Line Design, After Test Assembly, After Paint Assembly, Spaghetti Diagram.
User
Subscription Login to verify subscription
Notifications
Font Size