![Open Access](https://i-scholar.in/lib/pkp/templates/images/icons/fulltextgreen.png)
![Restricted Access](https://i-scholar.in/lib/pkp/templates/images/icons/fulltextred.png)
![Open Access](https://i-scholar.in/lib/pkp/templates/images/icons/fulltextgreen.png)
![Open Access](https://i-scholar.in/lib/pkp/templates/images/icons/fulltext_open_medium.gif)
![Restricted Access](https://i-scholar.in/lib/pkp/templates/images/icons/fulltextred.png)
![Restricted Access](https://i-scholar.in/lib/pkp/templates/images/icons/fulltext_restricted_medium.gif)
Mechanised Construction in Tube Railway-Soft Soil Tunnelling
Subscribe/Renew Journal
The Metropolitan Transport Project (Railway) is entrusted with the charge of constructing a Tube Railway in Calcutta as an additional means of transport to meet the increasing traffic needs in the metropolis. At present, a length of about 17 km of track extending from Dum Dum to Tollyganj is under execution.
User
Subscription
Login to verify subscription
Font Size
Information
![](https://i-scholar.in/public/site/images/abstractview.png)
Abstract Views: 167
![](https://i-scholar.in/public/site/images/pdfview.png)
PDF Views: 0