Open Access Open Access  Restricted Access Subscription Access
Open Access Open Access Open Access  Restricted Access Restricted Access Subscription Access

Reduction in Cycle Time of an Assembly Line Using Kilbridge and Westers Method


Affiliations
1 Production Engg. Dept., College of Engg., Pune, India
     

   Subscribe/Renew Journal


Planning and balancing of assembly lines is a complex problem which is often very hard to solve with classical scheduling approaches. This paper demonstrates the concept of line balancing by using the Kilbridge and Westers method to balance the line and then evaluate the thus obtained solution using simulation techniques, before it is actually implemented on the line.

Keywords

Assembly Line Balancing, Simulation, Layout, Kilbridge and Westers Method.
User
Subscription Login to verify subscription
Notifications
Font Size

Abstract Views: 196

PDF Views: 0




  • Reduction in Cycle Time of an Assembly Line Using Kilbridge and Westers Method

Abstract Views: 196  |  PDF Views: 0

Authors

Sameer D. Patil
Production Engg. Dept., College of Engg., Pune, India
N. R. Rajhans
Production Engg. Dept., College of Engg., Pune, India

Abstract


Planning and balancing of assembly lines is a complex problem which is often very hard to solve with classical scheduling approaches. This paper demonstrates the concept of line balancing by using the Kilbridge and Westers method to balance the line and then evaluate the thus obtained solution using simulation techniques, before it is actually implemented on the line.

Keywords


Assembly Line Balancing, Simulation, Layout, Kilbridge and Westers Method.