Open Access
Subscription Access
Open Access
Subscription Access
Analysis and Improvement in Plant Layout for Effective Production in Manufacturing Industries
Subscribe/Renew Journal
The various methods were proposed in the past to address the issue of selection of appropriate plant lay out selection for a given manufacturing industrial application, there is a need for a systematic and logical scientific method or mathematical tool to guide user organization in taking a proper decision. The objective of layout selection procedure is to identify the pertinent selection criteria (both quantitative and qualitative type) and to select proper lay out by eliminating the unproductive ones. This paper present an effective decision making framework for plant lay out selecting in manufacturing industries using a multiple criteria decision making method, Preference Ranking Organization Method for Enrichment Evaluation (PROMETHEE). The proposed decision making framework is practical for ranking layout design in terms of their overall performance with respect to multiple criteria.
Subscription
Login to verify subscription
User
Font Size
Information
- Pramod P. Shewale, Manmath S. Shete, Prof. Dr. S. M. Sane “Improvement In Plant Layout Using Systematic Layout Planning (SLP) For Increased Productivity” International Journal Of Advanced Engineering Research And Studies EISBN2249– 8974
- W. Wiyaratn, A. Watanapa “Improvement Plant Layout Using Systematic Layout Planning (SLP) For Increased Productivity” World Academy Of Science, Engineering And Technology 48 2010
- Anucha Watanapa, Phichit Kajondecha, Patcharee Duangpitakwong , And Wisitsree Wiyaratn “Analysis Plant Layout Design For Effective Production”,International Multi Conference Of Engineering And Computer Science 2011vol II,ISBN:978-988-19251-2-1
- Muther, R.: Systematic Layout Planning. Industrial Education Institute, Boston (1961)
- Randhawa S.U., and West T.M., 1995, “An integrated approach to facility location problem”, Computers and Industrial Engineering, 29, 261-265.
- Houshyar A., and White B., 1997, “Comparison of solution procedure to the facility location problem”, Computers and Industrial Engineering, 32, 77-87.
- Chu T.-C., 2002, “Selecting plant location via a fuzzy TOPSIS approach”, International Journal of Advanced Manufacturing Technology, 20, 859-864.
- Karray, F., Zaneldin, E., Hegazy, T., Shabeeb, A. And Elbeltagi, E., "Tools Of Soft Computing As Applied To The Problem Of Facilities Layout Planning." Ieee Transactions On Fuzzy Systems, Vol. 8, No. 4, 2000, Pp. 367-379.
- Grobelny J. On One Possibly “Fuzzy Approach To Facility Layout Problems.” International Journal Of Production Research 1987;25:1123-41.
- Evans, G.W., Wilhelm, M.R., Karwowski, W. “A Layout Design Heuristic Employing the Theory of Fuzzy Sets” International Journal Of Production Research 25, 1431–1450 (1987)
- Dweiri, F., Meier, F.A. “Application Of Fuzzy Decision-Making In Facilities Layout Planning.” International Journal Of Production Research 34, 3207–3225 (1996)
- Raoot, A.D., Rakshit, “A Linguistic Approach For Multiple Criteria Facility Layout Problems.” International Journal Of Production Research 29, 835–857 (1993)
- Ram Prakash, Ashish Agarwal, S.N.Mishra “Reduction In Material Handling Cost Using Travel Chart Technique” International Journal of Engineering Science and Technology (IJEST)
- Industrial Engineering and Management by M.Telsang , Tata Mc Graw Hill Publishing Company Limited , New Delhi.
- R. V. Rao, T. S. Rajesh “Software Selection In Manufacturing Industries Using A Fuzzy Multiple Criteria Decision Making Method, PROMETHEE” Intelligent Information Management, 2009, 1, 159-165
Abstract Views: 1330
PDF Views: 0