The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader. To download the PDF, click the Download link above.

Fullscreen Fullscreen Off


Objectives: To reduce time delays of Engineering Procurement Construction(EPC) projects in the oil and gas industry. Methods: This study used Business Process Re-engineering (BPR) methodology applied in project management. The methodology used starting Prepare for Engineering, Map and Analyze As-Is Process, Design To-Be Process, Re-engineered Process and Improve Continously. Findings:This study resulted an improved project planning using business process re-engineering method with time on engineering phase is reduced up to 55% and the procurement phase with an efficiency up to 35%. Application/Improvements:BPR method should be used in evaluating the delay in project work.

Keywords

Business Process Re-engineering, Information System, Oil and Gas, Operation Management, Project Management
User