Open Access Open Access  Restricted Access Subscription Access

Generation Expansion Planning for Iranian Power Grid Aiming at Providing Reliability by Comparing WASP-IV Program and Proposed Algorithm by Dynamic Programming


Affiliations
1 Department of Electrical Engineering, Mahshahr Branch, Islamic Azad University, Mahshahr, Iran, Islamic Republic of
2 Department of Mathematics, Mahshahr Branch, Islamic Azad University, Mahshahr, Iran, Islamic Republic of
3 Department of Forean Languese, Mahshahr Branch, Islamic Azad University, Mahshahr, Iran, Islamic Republic of
 

Generating expansion planning is one of the most significant parts in grid expansion planning. The generating expansion planning extends from 10 to 30 years; reliability is one of the most important constraints in power stations. In generating expansion planning, the loss of load Probability index is one of the most vigorous indices for reliability system. This paper tends to represent primarily generating expansion evaluation with the help of WASP-IV program and proposed algorithm using MATLAB program for Iranian power grid with and without pumped storage power plants within a time period of 10 years (2020- 2020), then the results have been compared.

Keywords

Generating Expansion Planning, Reliability, Loss of Load Probability, WASP-IV Program, Matlab Program
User

  • WangX and McDonaldJR (1994) Modern power system planning. McGraw-Hill Publ.
  • KimYC (1993) Multicriteria generation expansion planning with global environmental considerations. IEEE Trans.Eng.Manage. 40(2), 154-161.
  • Fukuyama Y and Ching HD (1996) A parallel genetic algoritm for generation expansion planning. IEEE Trans. Power Sys. 11(2), 955-961.
  • Shively D (2008) Energy storage methods for renewable energy integration and grid support. IEEE Energy 2030, Atlanta, Georgia, USA.pp: 17- 18.
  • Brown PD, Pecas Lopes JA and Manuel A Matos (2008) Optimization of pumped storage capacity in an isolated power system with large renewable penetration.IEEE Trans. Power Sys. 23(2).
  • Schoenung SM and Burns C (1996) Utility energy storage applications studies. IEEE Trans. Energy Conversion. 11(3).
  • Malik AS and Cory BJ (1991) Assessment of pumped storage plant benefits in fuel budgeting and operational planning. IEE Int. Conf. Manage. Hong Kong.
  • HungchenP (2008) Pumped-storage scheduling using evolutionary particle swarm optimization. IEEE Trans. Energy Conversion.23(1).

Abstract Views: 602

PDF Views: 119




  • Generation Expansion Planning for Iranian Power Grid Aiming at Providing Reliability by Comparing WASP-IV Program and Proposed Algorithm by Dynamic Programming

Abstract Views: 602  |  PDF Views: 119

Authors

Bahram Noshad
Department of Electrical Engineering, Mahshahr Branch, Islamic Azad University, Mahshahr, Iran, Islamic Republic of
Mina Goodarzi
Department of Mathematics, Mahshahr Branch, Islamic Azad University, Mahshahr, Iran, Islamic Republic of
Shahla Kivan
Department of Forean Languese, Mahshahr Branch, Islamic Azad University, Mahshahr, Iran, Islamic Republic of

Abstract


Generating expansion planning is one of the most significant parts in grid expansion planning. The generating expansion planning extends from 10 to 30 years; reliability is one of the most important constraints in power stations. In generating expansion planning, the loss of load Probability index is one of the most vigorous indices for reliability system. This paper tends to represent primarily generating expansion evaluation with the help of WASP-IV program and proposed algorithm using MATLAB program for Iranian power grid with and without pumped storage power plants within a time period of 10 years (2020- 2020), then the results have been compared.

Keywords


Generating Expansion Planning, Reliability, Loss of Load Probability, WASP-IV Program, Matlab Program

References





DOI: https://doi.org/10.17485/ijst%2F2012%2Fv5i7%2F30492