A Comparative Analysis of Performance of Domestic and Foreign Contractors : The Case of Ethiopian Federal Road Construction Projects
Subscribe/Renew Journal
In Ethiopia, infrastructure, particularly road construction, has been the most essential driver of economic growth. Simultaneously, it is widely acknowledged and analysed that the domestic road construction industry is inefficient, threatening its role as a driver of the country’s economic growth. Thus, the objective of the study was to make comparative analysis of domestic and foreign contractors’ performance in Ethiopian road construction in terms of cost, time, and quality. To meet the objective of the study a document review, semi-structured interview, and focused group discussion (FGD) were used as a data collection tool. Based on analysis, the finding shows that the domestic contractors are far from being competitive in terms of cost overrun, time overrun and quality performance but it is promising progress over time. Finally, the study mainly recommends domestic contractors should be mindful of the severe competition they face from foreign firms. This necessitates the participation of both the construction industry and the government in improving the sector’s competitiveness. Local road construction firms operate in a challenging business climate. Construction companies’ ability to use internal resources such as human resources, finance, equipment and plant, marketing information, technology, and others is encouraged because it gives contractors a competitive advantage. Allocating and effectively utilising such resources enables them to accomplish many client objectives, such as completing projects on schedule, under budget, and to specified quality standards.
Keywords
Road Construction, Domestic Contractors, Foreign Contractors, Project Performance, Time Overrun, Cost Overrun.
Subscription
Login to verify subscription
User
Font Size
Information
- Abubeker, J. (2015). Factors affecting time and cost overrun in road construction project in Addis Ababa (Msc thesis, Addis Ababa Institute of Technology, School of Civil and Environmental Engineering, Addis Ababa).
- Ahmed, A. (2018). A comparative analysis of the competitiveness of construction firms: On federal highway project implementation (MA thesis, Addis Ababa University College of Buisness and Economics, Departmenet of Management, Addis Ababa).
- Bossink, B., & Brouwers, H. (1996). Construction waste: Quantification and source evaluation. Journal of Construction Engineering and Management, 122(1).
- Hailemeskel, T. (2013). Management control of projects in construction industry. For Partial Fulfillment of the Requirements of MBA, Indra Gandhi National Open University Maiden Gari, New Delhi.
- Hussein, K. E. (2014). Management of change-induced rework in a construction project (Msc thesis, The British University in Dubai, Dubai).
- Johari, G. J., Walujodjati, E., Mulyana, S., & Permana, S. (2019). Factors affecting competitiveness small contractors in construction industry. 4th Annual Applied Science and Engineering Conference. Orlando: IOP Publishing.
- Mahamid, I., Bruland, A., & Dmaidi, N. (2012). Delay causes in road construction projects. Journal of Management in Engineering, 28(3), 300-310.
- Project Management Institute. (2008). A guide to the project management body of knowledge (4th ed.).
- Shrair, A. (2011). Improving bidders’ competitiveness strategies in construction projects (Phd thesis, Islamic University, Gaza Strip).
- World Economic Forum. (2013). The Africa competitiveness report (p. 14). Geneva.
- Yenealelm, F. K. (2020). Determinants of infrastructure project delay and cost escalations: The case of federal road and railway construction projects in Ethiopia. American Scientific Research Journal for Engineering, Technology and Sciences, 63, 102-106.
Abstract Views: 307
PDF Views: 0