Open Access
Subscription Access
Open Access
Subscription Access
A Method for Identifying Critical Success Factors of JIT Implementation in Different Circumstances (Case Study: Appliance Industry)
Subscribe/Renew Journal
World Class Manufacturing is a management philosophy that emphasizes on meeting external and internal customers' needs and expectations and importance of doing things right for world market society. One of the most world class production techniques is Just in Time (JIT). JIT production system has some components that need to implement it. Researches show that implementation of this system isn't unique in all time, places and circumstances. Implementation of this system may be differed from one company to another and the components those are needed to a company may not be necessary in another company. The purpose of this study is to introduce a mathematical method for identifying elements and components that are critical for JIT success in different circumstances. The study recommends this method by using TOPSIS and Pareto techniques. We use TOPSIS and Pareto techniques for setting a priority and thereby selection of component and use entropy method for giving coefficient to TOPSIS matrix. In this process, the statistical population to answer these questions is 1500 of the company's managers and engineers as experts in appliance industry of Iran. In this case we have extracted 5 components from 11 possible components in this system to implement in these companies (in appliance industry).The components for JIT implementation are different in different industries and companies. In a scene, while JIT implementation flow the logical priorities as an algorithm, it can perform regarding to its circumstances, readiness and needs. Concerning these circumstances, readiness and needs, these components of JIT must be implemented with priority in these companies: JIT supplier management, Preventive maintenance, set up time reduction, Lot sizing, Pull production system.
Keywords
World Class Manufacturing, Just in Time, Topsis Method, Pareto Technique, Entropy Method
Subscription
Login to verify subscription
User
Font Size
Information
- Alternburg, K., D., Griscom, J., Hart, F., Smith, and G., Wohler, 1999. Just-in-time logistics support for the automobile industry, Production and Inventory Management Journal 40 (2): 59-66.
- Aghazadeh, S., 2003. JIT inventory and competition in the global environment: a comparative study of American and Japanese values in auto industry, Cross Cultural Management 10 (4): 29-42.
- Cua, K. O., K. E., McKeon, and R. G., Schroeder, 2001. Relationship between implementation of TQM, JIT, and TPM and manufacturing Performance, Journal of Operation Management 19 (6): 675-694.
- Balakrishnan, R., T. J., Linsmeier, and M., Venkatachalam, 1996. Financial benefits from JIT adoption: effects of customer concentration and cost structure, The Accounting Review 71 (2): 183–205.
- Billesbach, T.J., and R., Hayen, 1994. Long-term impact of just-in-time on inventory performance measures, Production and Inventory Management Journal 35 (1): 62–67.
- Brox, J. A., and C., Fader, 1997. Assessing the impact of JIT using economic theory, Journal of Operations Management 15 (4): 371–388.
- Flynn, B.B., S., Sakakibara, and R.G., Schroeder, 1995. Relationship between JIT and TQM: practices and performance, Academy of Management Journal 38 (5): 1325–1353.
- Fullerton, R. R., and C. S., McMasters, 1999. An Empirical Investigation of the Relationship between JIT and Financial Performance, Working Paper, McGill University, Montreal, Que.
- Giunipero, L. C., (1990). Organizational support for just-in-time implementation, International Journal of Logistics Management 1 (2): 35-40.
- Hall, R.W., 1983, Zero Inventories, Dow-Jones-Irwin, Homewood, IL.
- Hwang, C. L. and K., Yoon, 1981. Multiple Attribute Decision Making: Methods and Applications, Springer-Verlag, Berlin.
- James, R., 1997. production/operations management, Quality performance and Value, University of Cincinnati, Verst Publishing Company.
- Lawrence, J., H., Lewis, 1996. Understanding the use of just-in-time purchasing in a developing country: the case of Mexico, International Journal of Operations & Production Management 16 (6): 68-90.
- Mehra, S., and R. A., Inman, 1992. Determining the critical elements of just-in-time management, Decision Sciences 23 (1): 160-74.
- Melnyk, S. A. and D. R., Denzler, 1996. Operations management, Value derived approach, Mc-Graw-Hill, New York, NY.
- Mould, G. and M., King, 1995. Just-in-time Implementation in Scottish electronic industry, Journal of Industrial Management and Data System 95 (9): 17-22.
- Noori, H. and R., Radford, 1995. Production and Operations Management: Total Quality and Responsiveness, Mc-Graw Hill, NY.
- Norris, D. M., R. D., Swanson, and Y., Chu, 1994. Justin-time production systems: a survey of managers, Production and Inventory Management Journal 35 (2): 63–66.
- Ockree, K. A., 1993, a just-in-time production philosophy: empirical analyses and field study, Unpublished PhD thesis, School of Business, University of Kansas, USA.
- Petersen, P., 2002. The misplaced origin of just-in-time production methods, Management Decision, 40 (1): 82-8.
- Russel, R. S., and B. W., Taylor, 1995. Operation management: Focusing on quality and competiveness, Prentice-Hall, Englewood Cliffs, NJ.
- Sandanayake, Y.G., C. F. Oduoza, and D. G., Proverbs, 2008. A systematic modeling and simulation approach for JIT performance optimization, Robotics and Computer-Integrated Manufacturing 6 (11): 735-743.
- Salaheldin, S. I., 2005. JIT implementation in Egyptian manufacturing firms: Some empirical evidence, Journal of operations and production management 25 (4): 354-370.
- Schonberger, R.J., 1982. Japanese Management Techniques, Free Press, New York, NY.
- Spencer, M. S., and V. D., Guide, 1995. An exploration of the components of JIT: Case study and survey results, International Journal of operations and productions management 15 (5): 72-83.
- Voss, C. A. and S. J., Robinson, 1987. Application of just-in-time manufacturing techniques in the United Kingdom, International Journal of Operation and Production Management 7 (4): 46–52.
- Wafa, A., M., Yasin, 1998. A conceptual framework for effective implementation of JIT: an empirical investigation, International Journal of Operations & Production Management 18 (11): 1111-1124.
- White, R. and V., Prybutok, 2001. The relationship between JIT practices and type of production system, Omega 29 (2): 113-124.
- Yasin, M., A., Wafa, H., Small, 2001. Just-in-time implementation in the public sector: an empirical study, International Journal of Operations & Production Management 21 (9): 1195-1204.
Abstract Views: 586
PDF Views: 0