Open Access Open Access  Restricted Access Subscription Access
Open Access Open Access Open Access  Restricted Access Restricted Access Subscription Access

A Case Study: Innovations in Building High Capacity Power Transmission Corridors


Affiliations
1 Kerala State Elelctricity Board Ltd, TransGrid, Shoranur – 679122, Kerala, India
     

   Subscribe/Renew Journal


This paper addresses the critical issues pertaining to the construction of high capacity power transmission corridors through the reduced Right of Way (ROW). Upon analyzing the techno-commercial aspects of various tower configurations with conventional or upgraded conductors and Insulators, a combination of 400kV/220kV Multi-circuit Multi-voltage Tower configuration with newly proposed ACSS conductor and polymeric insulators in V string arrangement are found to be more viable for the construction of a 2000MW power corridor which utilizes the existing 35m RoW. The implementation of the above proposal is now reached to final stage in Kerala under Kerala State Electricity Board Ltd. aiming to evacuate power from HVDC Station, Thrissur to Northern Region of Kerala state.

Keywords

HTLS Conductors, MCMV Towers, Transmission Corridors.
User
Subscription Login to verify subscription
Notifications
Font Size

  • IS 5613/802.
  • CBIP Manual on Transmission line 3. CEA regulations 2010.
  • KSEBL documents related to survey and design of 400/220kV MCMV line.
  • CPRI design reports on 220/110kV MCMV towers.
  • CEA reports on RoW compensation for transmission lines
  • Technical report of High performance conductors by APAR industries.
  • Transmission cost data and Market rates of Transmission line construction labour and materials.

Abstract Views: 396

PDF Views: 1




  • A Case Study: Innovations in Building High Capacity Power Transmission Corridors

Abstract Views: 396  |  PDF Views: 1

Authors

V. Suresh
Kerala State Elelctricity Board Ltd, TransGrid, Shoranur – 679122, Kerala, India

Abstract


This paper addresses the critical issues pertaining to the construction of high capacity power transmission corridors through the reduced Right of Way (ROW). Upon analyzing the techno-commercial aspects of various tower configurations with conventional or upgraded conductors and Insulators, a combination of 400kV/220kV Multi-circuit Multi-voltage Tower configuration with newly proposed ACSS conductor and polymeric insulators in V string arrangement are found to be more viable for the construction of a 2000MW power corridor which utilizes the existing 35m RoW. The implementation of the above proposal is now reached to final stage in Kerala under Kerala State Electricity Board Ltd. aiming to evacuate power from HVDC Station, Thrissur to Northern Region of Kerala state.

Keywords


HTLS Conductors, MCMV Towers, Transmission Corridors.

References





DOI: https://doi.org/10.33686/pwj.v15i2.150400