The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader. To download the PDF, click the Download link above.

Fullscreen Fullscreen Off


The overall goal of this reasearch is to evaluate the relevance, effectiveness, and efficiency, of the Special Force Qualification Education and Training program or Commando Training (Program Dikkualsus Komando) held by Paskhas Education and Training Center. Paskhas is the Special Air Operation Command of the Indonesian Air Force, responsible for developing capability to conduct conventional and unconventional warfare.

This research uses the Program Evaluation Model, introduced by Daniel Stufflebeam and known as the CIPP Model, which contains 4 components:  Context, Input, Process, and Product. The locus of the research is in Education and Training Center of Paskhas in Bandung, however, the informans are taken purposively from Airforce HQ, A/F Curriculum Center, and Paskhas entities ranging from the Paskhas Command Center, Operational Wings, Battalions, and Detachments.

The data collection uses techniques of semi-structured interviews, documentation, and observation. The data analysis process is conducted by comparing the formulated criteria with the data collected. The result is displayed on a table score in each componen of CIPP. The scoring system uses 4, 3, 2, 1 grading system which describes the quality level of excellent, sufficient, insufficient, and poor.

Having lower scores of 2 and 3 in some aspects of all components, the research concludes that the Paskhas Commando Training Program can be continued with some improvement on those aspects having lower scores. To improve the program , the research also provides two action-plan models which should be executed consecutively: short term planning followed by medium term planning.

 


User
Notifications
Font Size