Open Access
Subscription Access
High-Power Interconnections for Future of Indian Mega Cities
Data compiled by studies estimates that total electric energy requirement for the 13 of present Indian mega cities by the end of 12th Plan will be about 168 BU and by end of 13th Plan the requirement would be 233 BU. Also the ambitious plan of developing 100 smart cities by Indian government requires energy security both in decentralized and centralized manner. So in order to meet these demand future Indian cities requires a strong power link so that huge amount of power can be bought into the cities, for which Gas Insulated Transmission Lines (GIL) can be thought of as an ultimate solution for the problems caused by over-head line or underground cable running through cities. This paper addresses how new possibilities can mitigate power flow problems, reduce the risk of failure of electrical transmission systems and enable the installation of optimum solutions regarding technical, economical and environmental aspects.
Keywords
Future Smart Cities, Future Smart Grid, Gas Insulated Transmission Lines, High Power Interconnections.
User
Font Size
Information
- CEA Report. Report on 18th Electric Power Survey of India. 2013 Mar; 2.
- Hillers T, Koch H. Gas Insulated Transmission Lines (GIL): A Solution for the Power Supply of Metropolitan Areas. CEPSI Conference; 1998; Thailand.
- Baer GP, Diessner A, Luxa GF. 420 kV SF6 Insulated Tubular Bus for the Wehr Pumped-Storage Plant, Electric Tests. IEEE Transactions on Power Apparatus and Systems. 1976; PAS-95(2).
- Baer G, Lehmann W. SF6 Insulated Metalclad 420kV Tubular Bus with Transfer Facility Connected to an Underground Hydroelectric Power Station. CIGRE Report 23-02. Paris; 1974.
- Alter J, Ammann M, Boeck W, Degen W, Diessner A, Koch H, Renaud F, Poehler S. N2/SF6 Gas-Insulated Line of a New Generation in Service. CIGRE Session, No. 39. Paris; 2002. p. 21–204.
- Koch H. Gas-Insulated Line (GIL) of the 2nd Generation. 7th International Conference on AC-DC Power Transmission; 2001; London.
- Coventry P, Fletcher P, Bockel E, Koch H, Schoeffner G. Modernisation of Metropolitan Substations. 15th Conference on Electric Power Supply Industry CEPSI; 2004; Shanghai.
- Schoffner G, Koch H. New Possibilities of Power Grid Modernization with Gas Insulated Line. Iasted Power Con, Special Theme “Blackout”. New York; 2003.
Abstract Views: 880
PDF Views: 458