Development of the Thirty-Meter Telescope Project
The Thirty-Meter Telescope (TMT) project is a well-advanced effort to construct one of the first of the next generation of extremely large telescopes with primary mirror diametre larger than 25 m. When used with an adaptive optics systems capable of producing diffraction- limited images, the science reach of a 30 m telescope is extraordinary with improvements in sensitivity over existing telescopes by as much as a factor of 80 for some kinds of observations. The TMT design extends that of the twin Keck 10 m telescopes now in operation and uses the same close-packed segmented primary mirror. The partnership that will finish the design, construct and operate the telescope is described.
Keywords
Adaptive Optics System, Large Telescopes, Segmented Mirrors.
User
Font Size
Information
- Nelson, J. E., Stressed mirror polishing: fabrication of an off-axis section of a paraboloid. Appl. Opt., 1980, 19, 2341–2352.
- Mast, T. S. and Nelson, J. E., Figure control for a fully segmented telescope mirror”. App. Opt., 1982, 21, 2631–2641.
- Mast, T. S., Gabor, G. and Nelson, J. E., “Edge sensors for a segmented mirror. Proc. SPIE, 1983, 444, 297–309.
- Wizinowich, P. L. et al., The W. M. Keck Observatory laser guide star adaptive optics system: overview. Pub. Astr. Soc. Pac., 2006, 118, 297–309.
- Reddy, B. E., India’s participation in the Thirty-Meter Telescope project, J. Astrophys. Astron., 2013, 34, 87–95.