Open Access Open Access  Restricted Access Subscription Access

Recent Developments in Optimal Placement of Phasor Measurement Units Considering in Incomplete Observability


Affiliations
1 School of Electrical and Electronics Engineering, Lovely Professional University, Phagwara - 144411, Punjab, India
 

Independent System Operator (ISO) monitors the SCADA system to continuously check the health of power system. SCADA system refreshing rate is several seconds which may cause delay or even miss important information and the ISO may not be able to take appropriate action when most needed. An emerging technology is the Phasor Measurement Unit (PMU) which takes the help of the Global Positioning System (GPS) and timestamps the whole power system network with much faster refreshing rates. In this paper difference of Phasor Measurement Unit (PMU) and SCADA is represented. Rules and conditions to optimally place the PMUs in power system are discussed. A review on methods used for placement of the PMU in the power system based on incomplete observability is given. Also the spanning tree search based optimal placement method is also discussed.

Keywords

Complete and Incomplete Observability, Optimal Placement, Phasor Measurement Unit (PMU), SCADA.
User

Abstract Views: 156

PDF Views: 0




  • Recent Developments in Optimal Placement of Phasor Measurement Units Considering in Incomplete Observability

Abstract Views: 156  |  PDF Views: 0

Authors

Dipesh Shirishbhai Doshi
School of Electrical and Electronics Engineering, Lovely Professional University, Phagwara - 144411, Punjab, India
Kirpal Singh Doad
School of Electrical and Electronics Engineering, Lovely Professional University, Phagwara - 144411, Punjab, India

Abstract


Independent System Operator (ISO) monitors the SCADA system to continuously check the health of power system. SCADA system refreshing rate is several seconds which may cause delay or even miss important information and the ISO may not be able to take appropriate action when most needed. An emerging technology is the Phasor Measurement Unit (PMU) which takes the help of the Global Positioning System (GPS) and timestamps the whole power system network with much faster refreshing rates. In this paper difference of Phasor Measurement Unit (PMU) and SCADA is represented. Rules and conditions to optimally place the PMUs in power system are discussed. A review on methods used for placement of the PMU in the power system based on incomplete observability is given. Also the spanning tree search based optimal placement method is also discussed.

Keywords


Complete and Incomplete Observability, Optimal Placement, Phasor Measurement Unit (PMU), SCADA.



DOI: https://doi.org/10.17485/ijst%2F2016%2Fv9i48%2F139508