The PDF file you selected should load here if your Web browser has a PDF reader plug-in installed (for example, a recent version of Adobe Acrobat Reader).

If you would like more information about how to print, save, and work with PDFs, Highwire Press provides a helpful Frequently Asked Questions about PDFs.

Alternatively, you can download the PDF file directly to your computer, from where it can be opened using a PDF reader. To download the PDF, click the Download link above.

Fullscreen Fullscreen Off


Independent System Operator (ISO) monitors the SCADA system to continuously check the health of power system. SCADA system refreshing rate is several seconds which may cause delay or even miss important information and the ISO may not be able to take appropriate action when most needed. An emerging technology is the Phasor Measurement Unit (PMU) which takes the help of the Global Positioning System (GPS) and timestamps the whole power system network with much faster refreshing rates. In this paper difference of Phasor Measurement Unit (PMU) and SCADA is represented. Rules and conditions to optimally place the PMUs in power system are discussed. A review on methods used for placement of the PMU in the power system based on incomplete observability is given. Also the spanning tree search based optimal placement method is also discussed.

Keywords

Complete and Incomplete Observability, Optimal Placement, Phasor Measurement Unit (PMU), SCADA.
User